Upgrade of existing Evaporator (2018). Press Feed Engineering (2021). Drainer Design for Local Construction (2021). Supply and Engineering of Decanter Installation (2021) . OTHERS.
> DATE: 2018 - 2021
Evaporator Upgrade: Complete redesign in order to automate the process. All control was supplied by AZ including valves, sensors, control board and control loops.
Engineering and Design: AZ worked in different areas of the plant. Optimising processes and work areas with positive impact on quality and characteristics of final products.